- Joined
- Jun 7, 2009
- Messages
- 1,805
- Thanks Received
- 1,388
From found information after March one can say that after March the manufacturers had to apply
for an new permission with the related new code (sämtliche Hersteller der Unterabteilung M = Metall
werden aufgefordert einen Erneuerungsantrag zu stellen. Mit dem 1. Oktober verlieren die vor dem
1.Oktober 1935 ausgestellten Berechtigungsnachweise ihre Gültigkeit).
I checked quickly some issues and have noticed the first M7 manufacturers
lost their permission:
21: Hermann Schneider from Solingen, the 14th of October;
61: Carl Tillmanns Söhne KG from Solingen, also the 14th of October;
7: Hermann Konejung AG from Solingen, the 19th of November;
58: Louis Perlemann from Solingen, with the same day.
From this one may conclude the M7 numbers were indeed not in force earlier then September.
for an new permission with the related new code (sämtliche Hersteller der Unterabteilung M = Metall
werden aufgefordert einen Erneuerungsantrag zu stellen. Mit dem 1. Oktober verlieren die vor dem
1.Oktober 1935 ausgestellten Berechtigungsnachweise ihre Gültigkeit).
I checked quickly some issues and have noticed the first M7 manufacturers
lost their permission:
21: Hermann Schneider from Solingen, the 14th of October;
61: Carl Tillmanns Söhne KG from Solingen, also the 14th of October;
7: Hermann Konejung AG from Solingen, the 19th of November;
58: Louis Perlemann from Solingen, with the same day.
From this one may conclude the M7 numbers were indeed not in force earlier then September.